Installation of three lifts in a hotel in Southern Evia
Installation of three silent systems with MRL technology for maximum space-saving in the building.
The project includes a 3-stop electric elevator for the reception area and a 4-stop elevator for the Spa (1 m/s), ensuring fast and quiet movement for guests.
The hotel's operation is complemented by a 2-stop hydraulic passenger-cargo elevator (0.63 m/s) to serve the kitchen and goods.